APC Smart-UPS SRT 96V 3kVA Battery Pack (SRT96BP)

When your APC Smart-UPS SRT 2200VA or 3000VA unit runs out of internal battery at the worst possible moment, the SRT96BP is the official, hot-swappable lifeline that turns minutes of runtime into hours. This 96V external battery pack is purpose-built for the high-performance SRT 2–3 kVA online series (SRT2200XLI, SRT3000XLI, etc.) and is one of the most popular extended-runtime accessories Schneider Electric sells globally.

If you’ve ever looked at the ~4-minute full-load runtime of an SRT3000XLI and thought “that’s not enough,” the SRT96BP is the answer.

Key Specifications (SRT96BP)

SpecificationDetails
ModelSRT96BP (also sold as SRT013 in some regions)
Nominal DC Voltage96 V
Capacity960 Wh (internal equivalent of ~3 kVA internal pack)
Battery TypeMaintenance-free sealed lead-acid (VRLA)
Configuration8 × 12 V / 9 Ah batteries (4 strings of 2)
Physical Size432 mm (H) × 85 mm (W) × 594 mm (D) – 2U rack/tower
Weight38 kg (with batteries)
ConnectionHeavy-duty Anderson-type DC quick-connect + auto-detection cable
Hot-SwappableYes – zero downtime addition or replacement
LED IndicatorsCharge status + online status
Expected Battery Life3–5 years (temperature dependent)
Warranty1 year (matches UPS electronics warranty)
Operating Temperature0–40 °C (same as host UPS)

How Many Packs Can You Add?

The SRT 2–3 kVA chassis supports up to 10 external SRT96BP packs in a single daisy-chain (the UPS automatically detects and displays total runtime).

Real-World Runtime Examples (SRT3000XLI – 2700 W / 3000 VA load)

ConfigurationRuntime at Full Load (2700 W)Runtime at 50% Load (1350 W)
Internal batteries only~4 minutes~12–14 minutes
+ 1 × SRT96BP~15–16 minutes~45 minutes
+ 2 × SRT96BP~28–30 minutes~90 minutes
+ 4 × SRT96BP~60–65 minutes~3 hours
+ 8 × SRT96BP~2 hours 15 min~5.5–6 hours
+ 10 × SRT96BP (maximum)~2 hours 45 min~7+ hours

Even a single SRT96BP quadruples full-load runtime — enough for most generator start cycles or graceful migration of VMs.

Why Choose the Official SRT96BP Over Third-Party Packs?

  1. Automatic Detection & Calibration
    The UPS instantly recognizes the pack, recalculates runtime predictions, and adjusts charge current. Third-party packs often show “unknown runtime.”
  2. Perfect Physical Match
    Same 2U height, width, depth, color, and rail kit as the UPS — stacks cleanly in tower or rack.
  3. Smart Charging
    Temperature-compensated, multi-stage charging shared intelligently between all packs.
  4. Hot-Swap Without Tools
    Anderson quick-connect + mechanical interlock prevents accidental disconnection under load.
  5. Predictive Failure Notification
    The UPS monitors every individual pack and warns months ahead if one is failing.

Installation in 5 Minutes (Literally)

  1. Power on the UPS (it can be on battery or mains).
  2. Slide the new SRT96BP into the rack/tower position.
  3. Plug the DC cable (the pack ships with the correct cable).
  4. UPS beeps once, LCD updates total runtime instantly.
  5. Done — no reboot, no configuration.

No other brand makes extended runtime this seamless.

Typical Use Cases in 2025

  • Edge sites & micro data centers (retail, banking, telecom huts)
  • Small medical imaging or lab equipment needing 30–60 min ride-through
  • VMware / Hyper-V clusters that require time to vMotion workloads
  • Sites with slow-start generators (many diesel sets need 30–90 s)
  • Compliance requirements (healthcare, finance) mandating >15–30 min UPS autonomy

Maintenance & Replacement

Battery cartridge inside is the APCRBC140 (same as used in some SRT UPS internals). Replacement is user-serviceable in <10 minutes without powering down the load, and Schneider still stocks them worldwide in 2025.

Final Verdict

The APC SRT96BP is the single most cost-effective way to turn a 4-minute online UPS into a 30-minute, 1-hour, or even multi-hour solution — without sacrificing the zero-transfer-time protection that makes the SRT series special.

If you already own (or plan to buy) an SRT2200XLI or SRT3000XLI and runtime matters, budget for at least one SRT96BP from day one. Most enterprises that deploy SRTs end up buying 2–4 packs within the first year once they realize how painless scaling runtime really is.

In short: it’s not an accessory. For mission-critical loads, it’s a requirement. CONTACT US @ TIACO TECHNOLOGIES.

Running SRTs with extended battery packs? Share your stack height and real-world runtimes in the comments!