APC Smart-UPS SRT 192V 8–10 kVA Battery Pack (SRT192BP2)

When you’re protecting 6–10 kW of servers, storage, or networking gear with an APC Smart-UPS SRT 8000VA or 10000VA (SRT8KXLI or SRT10KXLI), the internal batteries give you only 2–4 minutes at full load — barely enough for the generator to wake up.
The official, hot-swappable solution is the SRT192BP2: a 192 V, dual-2U external battery pack that adds serious autonomy without compromising the legendary zero-transfer-time performance of the SRT online series.

This is the exact same pack used by banks, hospitals, colos, and edge macro-sites worldwide when downtime is measured in five- or six-figure sums per minute.

Key Specifications (SRT192BP2)

SpecificationDetails
ModelSRT192BP2 (2 × 2U modules)
Nominal Voltage192 V DC
Capacity1920 Wh per pack (≈ double the internal UPS pack)
Battery Type16 × 12 V / 9 Ah VRLA (8 batteries per 2U module)
Dimensions (each module)87 mm (H) × 432 mm (W) × 719 mm (D) – 2U
Total Height in Rack4U for one complete SRT192BP2
Weight (complete pack)87 kg
ConnectionHeavy-duty DC quick-connect + daisy-chain cable
Max Packs per UPSUp to 10 × SRT192BP2 (theoretically >10 hrs at half load)
Hot-SwappableYes – add or replace under full load
ChargingIntelligent multi-stage, temperature-compensated
Expected Life3–5 years at 25 °C (derates at higher temps)
Warranty1 year (extendable with service plans)

Runtime Impact (Real-World Numbers)

SRT10KXLI (10 kVA / 10 kW load)

ConfigurationRuntime at 10 kWRuntime at 5 kW (50 % load)
Internal batteries only~2.5–3 min~9–11 min
+ 1 × SRT192BP2~11–12 min~35–40 min
+ 2 × SRT192BP2~23–25 min~75–80 min
+ 4 × SRT192BP2~50–55 min~2.5–3 hours
+ 6 × SRT192BP2~80–90 min~4–4.5 hours
+ 10 × SRT192BP2 (max supported)~2.5 hours~7+ hours

Even one pack gives you enough time for most automatic transfer switches and generator starts. Four packs are the sweet spot for sites needing 45–60 minutes to ride through extended outages or perform live VM migrations.

Why the Official SRT192BP2 Wins Every Time

  1. Seamless Integration
    UPS auto-detects every pack the moment you plug it in. Runtime counter updates instantly, and the graphical LCD shows exact minutes remaining across the entire string.
  2. Matched Aesthetics & Rails
    Same width, depth, color, and Schneider rail kits as the 8/10 kVA UPS — perfect tower stacks or 4U-per-pack rack layouts.
  3. True Hot-Swap Under Load
    Mechanical interlock + Anderson SB120 connectors rated for 200 A continuous. You can add or replace a failed pack while the UPS is running 10 kW with zero risk.
  4. Predictive Battery Health
    Each module reports individual string health to the UPS. You’ll get a warning months before a pack actually fails.
  5. Shared Smart Charging
    The UPS distributes charge current optimally across internal + up to 10 external packs, preventing overcharge of newer batteries when you mix old and new.

Physical Deployment Tips from the Field

  • One SRT192BP2 = two 2U modules that must be mounted directly above or below each other (they ship pre-cabled together).
  • Use the included heavy-duty support trays or Schneider’s AR7708 vertical mounting brackets if you’re stacking more than three packs high.
  • Total depth with cables is ~770 mm — make sure your rack or cabinet can accommodate it.

Typical 2025 Deployments

  • Regional hospital PACS and EHR servers (4–6 packs for 60+ min autonomy)
  • Edge 5G macro sites and C-RAN hubs
  • Financial trading floors (low-latency servers that can’t tolerate even 5 ms glitches)
  • Small containerized data centers (Modular DC)
  • Broadcast and OB vans needing clean power for hours off-grid

Final Verdict

The SRT192BP2 is the no-compromise way to scale runtime on APC’s flagship 8–10 kVA online UPS systems. It’s expensive, heavy, and takes up 4U per pack — but when your UPS is the last line of defense between 10 kW of revenue-generating (or life-critical) equipment and a blackout, there is simply no better-matched, more reliable extension available.